The Ghana Grid Company Limited (GRIDCo) has been encouraged by the Institute for Energy Security (IES) to be transparent about the current status of the electricity industry.
Additionally, it requests that GRIDCo give the Electricity Company of Ghana (ECG) a precise estimate of the power supply that can be relied upon in a given amount of time.
“Such an information is vital for the ECG to plan its load response with a timetable,” t
The IES stated as much in a statement released on April 1st, signed by Nana Amoasi VII, its executive director.
The IES emphasized that in order to show complete cost recovery, ECG should concentrate on efficiently collecting money and controlling its load in accordance with the GRIDCo power supply.
“The Public Utility and Regulatory Commission (PURC) must look beyond the ECG to audit the upstream segment of the power sub-sector, particularly the GRIDCo, and export sales by the Volta River Authority (VRA),” it added.